NPS Install EV Charging Stations Fort Wadsworth

Staten Island, New York

Project Overview

MFS Construction completed a NPS contract to install six 208-volt 50-amp charging stations at Fort Wadsworth Building 210 in the Gateway National Recreation Area.

1221024 29b
1221024 29c Copy
Staten Island, New York

Project Details

Each bollard-style station, with a separate 120-volt GFCI receptacle, had two charging connections, located along the South side of the Parking Lot behind Building 210.

Bollards were installed first to establish conduit routes, mounted on cast-in-place footings with 3” conduit sweeps leading to the distribution panel. Conduit installation followed, with a mandrel test ensuring continuity. Cable was pulled through, connected to the charging stations, and linked to the transformer after an outage for safety checks.

The light pole installation paralleled the transformer’s process, with a foundation establishing conduit routes. Installation occurred concurrently with charging stations. Once proofed, the new light pole was connected to the transformer, and the service was commissioned and tested.

Stats

  • Owner:
    National Park Service

Services Provided

  • MFS provides materials, labor, equipment, and services necessary for the construction of a project and hires specialized subcontractors to perform specific duties as needed.